Activity variance

The difference between a revenue or cost item in the flexible budget and the
same item in the static planning budget. An activity variance is due solely to the difference
between the actual level of activity used in the flexible budget and the level of activity assumed
in the planning budget.
 



Article ID: 1684
Last updated: 18 Jul, 2021
Bản cập nhật: 1
Thuật ngữ tài chính kế toán -> A-B-C -> Activity variance
https://tuvan.webketoan.vn/activity-variance_1684.html